Process

  • Fall 2025

    Public announcement and internal preparation

  • April 30, 2026

    First event For operators and fleet managers au Centre national de conduite d'engins de chantier of Lévis

  • October 2026

    Start of field trials with a 𝐋𝐢𝐮𝐆𝐨𝐧𝐠 𝟖𝟓𝟔𝐇𝐄 wheel loader from Groupe Gymdex at Tricentris Lachute center

  • April 1 and 2, 2027

    Mid-term event as part of theExpo Grands Travaux in Saint-Hyacinthe

  • Summer–Fall 2027

    Second round of field tests

  • Winter 2028

    Third round of field tests (if needed)

  • June 2028

    Project closing event as part of theExpoPelle in Mirabel and publication of the summary guide

Run from 2025 to 2028, the Plug-in Fleet Heavy Equipment aims to test, measure, and share results related to the electrification of heavy construction and industrial machinery.

The project includes six field trials each lasting two weeks each, between fall 2026 and spring 2028. During these trials, a range of fully electric machines, including excavators, wheel loaders and backhoe loaders, will be evaluated under real-world operating conditions within the day-to-day activities of our partner organizations across Quebec. A charging solution tailored to the specific requirements of each site will also be deployed to document and share practical insights on a key electrification challenge: planning and managing charging operations on job sites.

These trials will generate both quantitative and qualitative data related to performance, range, operational conditions, environmental benefits, and operating costs compared to diesel machinery. At every stage, easy‑to‑understand technical reports will be released to provide Québec’s ecosystem with reliable and neutral information.

Rapport: Projet de démonstration de camions électriques au Québec
Data sharing
Scroll to Top