5 participants have the opportunity to benefit from a free electric truck for a period of one month, with the establishment of a temporary charging infrastructure directly at the home port. This initiative aims to significantly reduce greenhouse gas (GHG) emissions by several tons while providing an enjoyable experience thanks to the high performance of electric trucks.

Stay tuned to follow the exciting developments of this project!

Which truck will our first participant have the privilege of driving?

To be continued from August 28, 2023!

Trial #1

 

August 28th au September 21st 2023
Freightliner eCascadia – 475kWh
Road : #193

Fact sheet of preliminary analysis  (French only)

Full report (French only) – Phase 2

Trial closure event September 21, 9am to 12pm

 


 

Trial #2

October 23rd to November 17th 2023
Peterbilt 579EV – Battery pack 396kWh
Road : #

Fact sheet of preliminary analysis  (French only)

Full report (French only) – Phase 2

Trial closure event November 16 , 9am to 12pm

 

Trial #3

February 12th to March 08th 2024
Lion6 – 252kWh

Fact sheet of preliminary analysis  (French only)

Full report (French only) – Phase 2

 

 

Trial #4

25 mars au 19 avril 2024
Kenworth T680E – Battery pack 396kWh

Fact sheet of preliminary analysis  (French only)

Full report (French only) – Phase 2

 

 

Trial #5

May 13th to June 07th
Peterbilt 220EV – Battery pack 282kWh

Fact sheet of preliminary analysis  (French only)

Full report (French only) – Phase 2